11 |
Maqsha Block 450 |
Ministry of Works |
112896.67 |
2010-09-18 |
2011-01-01 |
The scope of work in Maqsha Block 450 is to asphalting the opening roads. The work include excavation to formation levels & sand filling where required, Installation of CD & SL services ducts , kerbing , manhole razing up to asphalt levels , road base , Asphalt base course & wearing course , verge filling for road edge safety, Block paved parking spaces 80 mm & in footpath areas. |