8 Improvement of Avenue 1 Sitra Ministry of Works 923498.42 2012-03-04 2012-11-10 Works include excavation and filling to formation, Unsuitable material has been removed and replacement with Dreged fill type "B" and Stones where required. Work includes relocation of utilities in conjunction withroad works, installation of service ducts, (RCD , EDD & SLD) asphalt road construction, block paved parking spaces, improvement of storm water drainage system, block paving of footpaths, provision of pedestrian fences , Crush Barrier and street lighting, and the installation of traffic signal at Sitra Ave 1.