No. Description Client Contract Amount From To Summary of the Project
3 Infrastructure works for 30 Nos. T8 Houses site 190 blocks 553 and 555 Budaya and for 4 Nos. T3m houses site 146 block 438 Al Qalah Ministry of Housing 75000.00 2013-10-13 2013-02-12 Scope of work in Al - Qalah is to provide the Drainage pipe line service; work includes the excavation in rock, excavation in low water table & backfill with sand, aggregate and concrete where required for safety of pipes. It includes Installation of Manhole, Chambers and connection with old chambers, kerbing, asphalting & Road sign boards & road marking


  • IMG_6168
  • IMG_6156
  • IMG_1222
  • IMG_1138
  • IMG_0624
  • IMG_0577
  • IMG_0518
  • IMG_0385